What types of equipment are needed to build a steel pipe production line and how much does it cost?
TIME: 2021-03-27
In general, when constructing steel pipe production lines, there are two types: mold drawn pipes and welded pipes.
The production of drawn pipes generally starts from the pipe blank and requires several drawing machines, heat treatment equipment, acid washing equipment, polishing equipment, packaging equipment, etc. The cost of constructing this steel pipe production line should not be less than 3 million yuan.
The production of welded pipes usually starts from sheet metal or steel strip, requiring a set of one-time forming equipment, polishing equipment, packaging equipment, etc. The funds also need to be based on your production specifications and market positioning, generally not less than 1.5 million.
In the same situation, the larger the production specifications, the greater the required equipment investment and working capital.